Riyadh 132 kV Cable Replacement

Riyadh 132 kV Cable Replacement

Client
Saudi Electricity Company
Location
Riyadh, KSA
Year
2021

About the project

Design and replacement of existing 132 kV LPOF underground cables with new 132 kV, 3 x 1C x 1200 mm² copper XLPE cable, single cable per phase, together with fibre optic cables.

Scope of work

SDEC carried out the base and detailed design for the Saudi Electricity Company's replacement of existing 132 kV low-pressure oil-filled (LPOF) underground cables in Riyadh with new 132 kV XLPE cables - 3 x 1C x 1200 mm² copper, one cable per phase in flat formation - laid together with fibre optic cables. The design covered the cable route, ampacity, short-circuit and induced-voltage calculations, the sheath bonding scheme, link and joint box details, trench, duct bank and HDD sections, the fibre optic system, and the required modifications to the protection system.

Main deliverables

  • Key route plan and sections
  • Ampacity, short-circuit and induced-voltage calculations
  • Cable sheath bonding scheme
  • Link box and joint box details
  • Trench, duct bank and HDD plans and sections
  • Protection system modifications
  • Fibre optic cable layout and sections
  • Fibre optic cable schematics and interconnections

Engineering expertise for your next project.

Request a proposal