Central-West HVDC Link

Central-West HVDC Link

Contractor
Saudi Services for Electro Mechanical Works (SSEM)
Location
Central and Western regions, KSA
Voltage
VSC HVDC
Line length
298 km
Project reference
PTS-23SO385

About the project

Portion II of the overhead transmission line for the COA-WOA interconnection: a voltage source converter (VSC) HVDC link between the Central and Western operating areas of the Saudi power grid. This portion alone runs for 298 km. VSC HVDC technology gives fast, precise control of the power flowing between two large regional grids.

Scope of work

SDEC provided engineering design for this 298 km portion of the line, working with Saudi Services for Electro Mechanical Works (SSEM) as the construction contractor. SDEC's overhead transmission line services cover line layouts, tower structures, foundations and coordinated design verification.

Engineering expertise for your next project.

Request a proposal