525 kV HVDC Line, Portion I
- Contractor
- Hyundai Engineering & Construction
- Voltage
- ±525 kV HVDC
- Line length
- 207 km
- Project reference
- PTS-22WM309
- Services
- Power and transmission
About the project
Portion I of the ±525 kV high-voltage direct current (HVDC) overhead transmission line between the NIC South and YCNT converter stations, a 207 km section of a long-distance HVDC link. ±525 kV is one of the highest transmission voltages in use, chosen to move very large amounts of power over long distances efficiently.
Scope of work
SDEC provided engineering design for this 207 km portion of the line, working with Hyundai Engineering & Construction as the construction contractor. SDEC's overhead transmission line services cover line layouts, tower structures, foundations and coordinated design verification.