525 kV HVDC Line, Portion III

525 kV HVDC Line, Portion III

Contractor
Larsen & Toubro (L&T)
Voltage
±525 kV HVDC
Line length
200 km
Project reference
PTS-22WM309

About the project

Portion III of the ±525 kV HVDC overhead transmission line between the NIC South and YCNT converter stations, a further 200 km section of the same long-distance link. Together with Portion I, SDEC's work on this line covers 407 km.

Scope of work

SDEC provided engineering design for this 200 km portion of the line, working with Larsen & Toubro (L&T) as the construction contractor. SDEC's overhead transmission line services cover line layouts, tower structures, foundations and coordinated design verification.

Engineering expertise for your next project.

Request a proposal