Hajer-2 Power Plant Connection
- Contractor
- Al-Gihaz Contracting
- Voltage
- 380 kV
- Line length
- 72 km
- Project reference
- PTS-24EO348
- Services
- Power and transmission
About the project
The overhead line portion of the integration of the Hajer-2 380 kV independent power plant (IPP): 72 km of 380 kV overhead transmission line connecting the new generation capacity to the grid.
Scope of work
SDEC provided engineering design for the 72 km overhead line, working with Al-Gihaz Contracting as the construction contractor. SDEC's overhead transmission line services cover line layouts, tower structures, foundations and coordinated design verification.