Hajer-2 Power Plant Connection

Hajer-2 Power Plant Connection

Contractor
Al-Gihaz Contracting
Voltage
380 kV
Line length
72 km
Project reference
PTS-24EO348

About the project

The overhead line portion of the integration of the Hajer-2 380 kV independent power plant (IPP): 72 km of 380 kV overhead transmission line connecting the new generation capacity to the grid.

Scope of work

SDEC provided engineering design for the 72 km overhead line, working with Al-Gihaz Contracting as the construction contractor. SDEC's overhead transmission line services cover line layouts, tower structures, foundations and coordinated design verification.

Engineering expertise for your next project.

Request a proposal