Starah Wind Farm Connection

Starah Wind Farm Connection

Contractor
Larsen & Toubro (L&T)
Location
Wadi Al-Dawasir, KSA
Voltage
380 kV double circuit
Line length
267 km
Project reference
PTS-23CO393

About the project

A 267 km, 380 kV double-circuit overhead transmission line from the Starah wind power plant (#9085) to the existing Wadi Al-Dawasir bulk supply point (BSP #9701), carrying new wind generation onto the transmission network. A double-circuit line carries two independent circuits on the same towers, doubling capacity along one route.

Scope of work

SDEC provided engineering design for the 267 km overhead line, working with Larsen & Toubro (L&T) as the construction contractor. SDEC's overhead transmission line services cover line layouts, tower structures, foundations and coordinated design verification.