Starah Wind Farm Connection
- Contractor
- Larsen & Toubro (L&T)
- Location
- Wadi Al-Dawasir, KSA
- Voltage
- 380 kV double circuit
- Line length
- 267 km
- Project reference
- PTS-23CO393
- Services
- Power and transmission
About the project
A 267 km, 380 kV double-circuit overhead transmission line from the Starah wind power plant (#9085) to the existing Wadi Al-Dawasir bulk supply point (BSP #9701), carrying new wind generation onto the transmission network. A double-circuit line carries two independent circuits on the same towers, doubling capacity along one route.
Scope of work
SDEC provided engineering design for the 267 km overhead line, working with Larsen & Toubro (L&T) as the construction contractor. SDEC's overhead transmission line services cover line layouts, tower structures, foundations and coordinated design verification.