About the project
The overhead line portion of the connection of the new Al-Dawadmi wind power plant (#9096): 200 km of 380 kV double-circuit overhead transmission line bringing new renewable generation onto the Saudi grid.
Scope of work
SDEC provided engineering design for the 200 km overhead line, working with Larsen & Toubro (L&T) as the construction contractor. SDEC's overhead transmission line services cover line layouts, tower structures, foundations and coordinated design verification.